CVE search
Every published CVE plus open-source advisories (NVD, OSV, GitHub), with CVSS, EPSS and whether it is being exploited in the wild (CISA KEV). Updated every few hours. Our scans match these against the technologies they detect.
Every published CVE plus open-source advisories (NVD, OSV, GitHub), with CVSS, EPSS and whether it is being exploited in the wild (CISA KEV). Updated every few hours. Our scans match these against the technologies they detect.
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0, 22.12.1.0-22.12.16.0 and 23.12.1.0-23.12.10.0. Easily exploitable vulnerability allows |
| 21/01/2025 |
| CVE-2025-21526 | MOYENNE5.4 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0, 22.12.1.0-22.12.16.0 and 23.12.1.0-23.12.10.0. Easily exploitable vulnerability allows | 21/01/2025 |
| CVE-2024-21095 | ÉLEVÉE8.2 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 19.12.0-19.12.22, 20.12.0-20.12.21, 21.12.0-21.12.18, 22.12.0-22.12.12 and 23.12.0-23.12.2. Easily exploitable vulnerability allows | 16/04/2024 |
| CVE-2020-36518 | ÉLEVÉE7.5 | jackson-databind before 2.13.0 allows a Java StackOverflow exception and denial of service via a large depth of nested objects. | 11/03/2022 |
| CVE-2021-44832 | MOYENNE6.6 | Apache Log4j2 versions 2.0-beta7 through 2.17.0 (excluding security fix releases 2.3.2 and 2.12.4) are vulnerable to a remote code execution (RCE) attack when a configuration uses a JDBC Appender with a JNDI LDAP data source URI when an attacker has control of the target LDAP server. This issue is fixed by limiting JND | 28/12/2021 |
| CVE-2021-45105 | MOYENNE5.9 | Apache Log4j2 versions 2.0-alpha1 through 2.16.0 (excluding 2.12.3 and 2.3.1) did not protect from uncontrolled recursion from self-referential lookups. This allows an attacker with control over Thread Context Map data to cause a denial of service when a crafted string is interpreted. This issue was fixed in Log4j 2.17 | 18/12/2021 |
| CVE-2021-2386 | MOYENNE4.3 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera | 21/07/2021 |
| CVE-2021-2366 | MOYENNE6.4 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.12.0-17.12.20, 18.8.0-18.8.23, 19.12.0-19.12.14 and 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attack | 21/07/2021 |
| CVE-2021-2351 | ÉLEVÉE8.3 | Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced Networking Option. Successful attacks req | 21/07/2021 |
| CVE-2020-5421 | MOYENNE6.5 | In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser used through the use of a jsessionid path parameter. | 19/09/2020 |
| CVE-2020-14706 | MOYENNE5.9 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0.0-17.12.17.1, 18.1.0.0-18.8.19 and 19.12.0-19.12.5. Difficult to exploit vulnerability allows unauthenticated attacker with ne | 15/07/2020 |
| CVE-2020-14653 | MOYENNE5.4 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 16.1.0.0-16.2.20.1, 17.1.0.0-17.12.17.1 and 18.1.0.0-18.8.18.2. Easily exploitable vulnerability allows low privileged attacker with | 15/07/2020 |
| CVE-2020-10683 | CRITIQUE9.8 | dom4j before 2.0.3 and 2.1.x before 2.1.3 allows external DTDs and External Entities by default, which might enable XXE attacks. However, there is popular external documentation from OWASP showing how to enable the safe, non-default behavior in any application that uses dom4j. | 01/05/2020 |
| CVE-2020-2706 | MOYENNE5.4 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploi | 15/04/2020 |
| CVE-2020-2594 | MOYENNE6.5 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploi | 15/04/2020 |
| CVE-2020-2707 | MOYENNE5.4 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: WebAccess). Supported versions that are affected are 15.1.0.0-15.2.18.7, 16.1.0.0-16.2.19.0, 17.1.0.0-17.12.16.0, 18.1.0.0-18.8.16.0 and 19.12.0.0. Easily exploitable vulnerability allows | 15/01/2020 |
| CVE-2020-2556 | ÉLEVÉE7.3 | Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Core). Supported versions that are affected are 16.2.0.0-16.2.19.0, 17.12.0.0-17.12.16.0, 18.8.0.0-18.8.16.0, 19.12.0.0 and 20.1.0.0. Easily exploitable vulnerability allows low privilege | 15/01/2020 |
| CVE-2019-10219 | MOYENNE6.1 | A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack. | 08/11/2019 |